Reganosa’s board of directors has appointed Carlos Collantes Pérez-Ardá as president, replacing José María Paz Goday, who will continue to be a member of the board. The new president, who has been on the board of directors since 2017, will take…
MUGARDOS LNG TERMINAL YESTERDAY WELCOMED THE SMALLEST VESSEL TO HAVE EVER DOCKED ON ITS PIER
The Reganosa terminal in Mugardos welcomed the smallest vessel that has ever docked on its pier on last Sunday. It was the Coral Fungia, a ship that is only 137 metres in length and which unloaded 9,500 cubic metres of liquefied…
REGANOSA’S PLANT IN THE PORT OF FERROL RECEIVES THE FIRST LNG LOAD TO GET TO SPAIN FROM CORPUS CHRISTI, TEXAS
Reganosa’s plant in the port of Ferrol receives the first LNG load to get to Spain from Corpus Christi, Texas, a plant which began operating on last December. The load, which was carried by Belgian ship Excalibur, shows the suitability to…